Resources · 10 guides
From the data you have to a file the Information System accepts.
A Google Earth file, a shapefile, a spreadsheet, a phone. Step-by-step guides for each, and the rules behind them. Every rule stated is sourced.
01
Get your plots into GeoJSON
Start from the format you were sent.
- From Google Earth (KML)Draw plot boundaries in Google Earth Pro, save them as KML, and turn them into a GeoJSON file the EU Information System accepts, step by step..kml .kmz
- From a shapefileTurn a zipped shapefile from QGIS, ArcGIS or a survey team into WGS84 GeoJSON for an EUDR due diligence statement, keeping the coordinate system right..shp .prj
- From Excel or CSVTurn a spreadsheet of plot coordinates into GeoJSON for the EU Information System: a row per plot, a row per corner, or WKT, with decimal commas and DMS..csv .xlsx
- From GPS phone appsHow to walk a plot boundary with a smartphone GPS app so the result passes the EU Information System: accuracy, corners, closing the loop, and exporting..gpx
- UTM to WGS 84Recognise UTM and national-grid coordinates, find the right zone and EPSG code, and convert them to the WGS84 degrees the EU Information System requires.EPSG:4326
02
Understand the rules
What the regulation and the Commission's specification actually require.
- Point vs polygon (4 ha)When a single GPS point is enough for an EUDR plot and when a polygon is required: the four-hectare rule, the cattle exception, and the Area property.4 ha
- Type I vs Type IIThe EUDR specification defines two variants of the geolocation file. What each is for, which properties they need, and how the checker tells them apart.GeoJSON
- The 25 MB limitHow the 25 MB limit per statement works, what makes geolocation files big, how to shrink them without changing the land, and how to split statements.25 MB
- TimelineEvery date that matters for EUDR geolocation (the cut-off, the application dates after two postponements, the 2026 changes), checked in the Official Journal.31 Dec 2020
03
Before you submit
The last look before a due diligence statement goes in.
04
Tools and reference
Free, and no account needed.
Start with your own plots.
Check a supplier file free in your browser, or start a 14-day trial with your whole supply chain.